England, England high-speed railroad 8 widespread shutdown, the reason is found in the train cracks. The train model found to be the problem is Hitachi 800, mainly used by the British Western Railway Company, London Northeast Railway Company and others. The reason for the appearance of the crack is under investigation, affecting cities including Edinburgh, Newcastle, York, London and other places.
It is understood that the type of train, which came into service in 2017, is manufactured at Hitachi’s plant in the northeast of England, UK.
Hitachi said there are 181 Hitachi 800 trains in operation across the UK, with speeds of up to 225 kilometers per hour.
The British Ministry of Transport under-secretary for railroads Heaton Harris tweeted that after cracks were found in the chassis of some Hitachi trains on the morning of the 8th, a “rigorous inspection” was carried out, and the high-speed railroad is likely to be shut down for some time.
Britain’s national railway said that the inspection is a precautionary measure, after the inspection is completed, the train will resume operation as soon as possible.
Britain’s western railroad company’s train stopped in England Bristol a train station platform.
Recent Comments